The vacuum canister and motor is located outside of the cleanroom for ease of cleaning and maintenance.
Clean room electrical outlet covers.
Rinse with clear water and set them aside to air dry.
This can be simply wiped down with warm water and soap.
Device flanges are recessed within the front opening for mounting the electrical device.
Spray a dust dirt removal agent on a cotton swab and carefully wipe away the dirt on the power outlet.
Mecart clean room wall panels are typically built using two heavy duty galvannealed steel panels sandwiched to create a 4 panel allowing electrical outlets and mechanical components to be placed within the wall cavity prior to the on site installation.
Soak the outlet covers in a mixture of cup of liquid detergent and a bucket of water.
If the cover looks too discolored it s cheap to replace from any hardware store.
Twist the black wires together then twist the white wires and finally the bare ground wires.
Electrical systems are divided into 600 480 3 phase higher voltage systems for process and hvac and air handling systems.
Extract ports located in the modular wall panels are capped with spring tension covers and are wired with 24 volt plenum cable for auto activation at point of use.
A sealing gasket is fitted over the front opening with the electrical device installed therein.
With ul listed components conforming to national electric codes uniteds raceway system is made up of pre wired connections for light switches 110v outlets for lights and fan powered hepa units.
Wlrs wlrd and wlgf wet location covers for device boxes for use as general purpose utility receptacle covers for industrial commercial or residential use used in areas where electrical requirements do not exceed medium duty ratings 15a or 20a.
Remove a middle run outlet if another device is connected to the outlet you want to cap you don t want to disconnect the wire feeding the outlet.
On smaller cleanrooms we recommend that these be installed in your change room.
The panels are custom made for your cleanroom projects pre engineered and pre fabricated to eliminate any cutting and buffing during the on site installation.
Apply the cover back on the wall and turn the power back on.
Scrub the surface of the covers with a sponge.
Other power options available.